In the final accumulation of work done for the 2016-2017 school year with regards to thesis, the final report is published here. The final report contains lighting, electrical and daylighting depths and structural and mechanical breadths. Six spaces within the Griffin Academic Center had lighting redesigns to improve electrical lighting quality and efficiency. The electrical redesign expands the standby power system to  put the whole building on standby power. To support the expanded standby power system two rooftop structural members were redesigned. The entire facade of the building was redesigned to improve the daylighting and mechanical performance.  